7E: Difference between revisions

From National Optronics resources center
Jump to navigationJump to search
Line 41: Line 41:
*[http://nationaloptronics.net/download/7E/procedure/111903686E-6ES-7E--Replacement-of-the-Electric-Chuck-Assembly.pdf 6E-6ES-7E Replacement of the Electric Chuck Assembly]
*[http://nationaloptronics.net/download/7E/procedure/111903686E-6ES-7E--Replacement-of-the-Electric-Chuck-Assembly.pdf 6E-6ES-7E Replacement of the Electric Chuck Assembly]


*[http://nationaloptronics.net/download/7E/procedure/7E-Probe-Replacement-Procedure.pdf 7E Probe Assembly Replacement Procedure]
*[http://nationaloptronics.net/download/7E/procedure/11190539-6E-6ES-6EM-6EL-7E-Replacement-of-the-Clamp Arm-and-Lead-Screw-Assembly_3_16-Shoulder-Screw.pdf 6E-6ES-6EM-6EL-7E - Replacement of the Clamp Arm and Lead Screw Assembly 3/16 inch Shoulder Screw]


=Software=
=Software=

Revision as of 19:52, 24 January 2012

Documentation

Specials instructions for USB card cage

  • How to update a 7E floppy disk card cage to a 7E USB card cage (download)
  • How to use the 7E USB installer (download)

Manuals






Procedure Documents

Software

Instructions

Execute the download program on a PC to create an update USB thumb drive or a floppy disk for the 7E edger.

Version 1.29

New features
  • Add job screen options for Chemistrie frames (requested by Eyenovate).
Bugs fixed
  • FCRV does not download properly for the left eye.
  • Multi-cutter collision avoidance is not correct when 5 degree taper cutter is installed.
  • Axis burn-in graph indicates false errors.
Download